onsdag den 16. oktober 2013

Test setup by the dam


In the summer 2013 further research on feedback from our case description at location A, led to the design of a simple and flexible damming setup which has been temporary installed. This step was possible due to free access of concrete blocks and volunteering work from the local kayak club. We greatly appreciate this help!
The following shows pictures from the test setup and installation work.

Test Setup (without the middle section)

Middle section which goes in between the "dam"
Bolt for attachment


Truck loaded. Preparing for submerging the middle section
Placing of the sections in the water
Result
Setting up temporary plates for water test 




Result after placing the stairs


Further work

  • Sealing of the setup
  • Running strength test at different water levels
  • Identifying fine-tuning adjustments

torsdag den 8. august 2013

DEVELOPMENT 2013

This year we will try to improve the feature. We want to use already existing projects which is similar to the conditions in this town. This publication illustrates our ideas for improvement to specify the opportunities of further improvement.  With this publication, we hope to acquire more specific directions in the further process.
To get feedback to this publication, we have posted this on the community site http://www.ukriversguidebook.co.uk/forum/viewtopic.php?f=3&t=104836&e=0

lørdag den 5. maj 2012

Construction work 2011/12


Construction work started in 2011 using volunteers from the local canoe club.

Doing a high water release, the entire construction got flushed out.

After adding some reinforcement of the suspension, the construction was reconstructed in 2012.
Watch more pictures here:

mandag den 19. juli 2010

The Idea of 2010

The project idea of 2010 is shown on this video:



The publication of 2010 is available here (Danish):